This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 26, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: March 25, 2024
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: May 4, 2023
Southern Ports Authority propose to facilitate export of magnetite by allowing the construction of a new Berth 5 and expanding current anchorages in King George Sound. Berth 5 is to be constructed consisting of an offshore piled structure with mooring dolphins. Transhipment vessels will leave Berth 5, transit to an inner anchorage and load an ocean-going vessel for first-stage export. Vessels will then transit to a deeper anchorage to complete second-stage export. The anchorages are currently... Read more...Last updated: December 1, 2021
The Department of Transport is proposing to construct a safe and accessible boating facility at the existing boat ramp site at Entrance Point, Broome. The proposal is located within the existing Port of Broome port limits, approximately 350 metres south-west of the previously assessed Kimberley Marine Offloading Facility. The proposal includes construction of a boat ramp, two finger jetties, two groynes, an offshore breakwater and associated terrestrial public amenity infrastructure. Piling... Read more...Last updated: July 29, 2021
The proponent is proposing to develop the remainder of Part Lot 420, Yangebup Road, Yangebup for educational purposes; the site contains an existing school and church. The development envelope for the proposal is 2.63 hectares (ha) and contains 2.07 ha of native vegetation. This vegetation is proposed to be cleared for the proposal which includes buildings, an access road, carpark and recreation areas. Read more...