This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: January 18, 1999
Apache Northwest Pty Ltd proposes to drill two exploration wells, Chelonia-1 and -2 in Permit Area EP 342 which is located at the head of Exmouth Gulf. Both wells will have the same surface location, situated outside the Ningaloo Marine Park, approximately 100 m from the boundary and 4 km to the SSW of South Muiron Island. Read more...Last updated: January 7, 1992
Mobil Exploration and Producing Australia Pty Ltd has taken over as operator or a proposed offshore exploration drilling program for petroleum within permit area EP-325 within the Exmouth Gulf. This proposal seeks environmental approval for the drilling of exploration wells within three areas known as Cassidy, Cody and Spider. Read more...Last updated: December 10, 1991
Proposal to develop the Roller Oilfield within permit area TP/3 Part 1, specifically the drilling of a minimum of seven development wells from four monopod structures. Read more...Last updated: October 25, 1991
Western Australian Petroleum Pty Ltd (WAPET) is operator for the participants in Exploration Permit No. TP/3 Part 1. WAPET has already drilled some 18 wells within the Permit Area, has developed the Saladin, Cowle and Yammaderry oilfields and is currently seeking approval to develop the Roller Oilfield. Over the next five year period, WAPET proposes to drill a further four to twelve exploratory wells within Permit Area TP/3 Part 1. Read more...Last updated: April 26, 1991
LASMO Oil (Australia) has proposed an offshore exploration drilling program for petroleum within its permit areas EP-342 and TP/9 at the open end of Exmouth Gulf. This proposal seeks environmental approval for the drilling of two wells in 1991 followed by a minimum of three others over the period 1992-1994. Read more...Last updated: June 27, 1989
Minora Resources NL has submitted a proposal to drill a third exploration oil well in its lease, EP 325, Exmouth Gulf. The well is located 13 km south east of the town of Exmouth. Minora propose to use a jack-up rig and drilling would take about 24 days to complete. Drilling is proposed during the winter of 1989. Read more...