This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 7, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: June 26, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: March 27, 2013
Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...