This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 1, 2012
The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: July 9, 1999
Proposal to mine peat in Lake Tamworth which is located in Baldivis, approximately 40kms south of Perth. The lake is listed for protection in the Environmental Protection (Swan Coastal Plain Lakes) Policy which prohibits unauthorised filling, mining, drainage or effluent discharge into nominated wetlands. Read more...Last updated: December 7, 1996
The main components of the proposal are: a Conservation and Foreshore Reserve of approximately 23.9ha along the Mandurah Channel frontage of the development site; approximately 500 single residential waterside lots (R 15 and R20) established along the margins of 33ha of canal waterways, which will be linked with the existing canal system within the Port Mandurah Stage 1 development and the Mandurah Channel; two areas of communal (group) housing development (R 40) covering 2. 7ha and providing... Read more...Last updated: March 1, 1996
The Tony Scolaro Family Trust intends to redevelop an existing caravan park into a Park Home Estate. The proposal will involve the construction of new infrastructure including 120 park homes (demountable houses), associated access roads, a new wastewater treatment plan and infiltration areas for stormwater and treated wastewater. Read more...Last updated: June 11, 1993
The proposal is for a canal/urban residential estate development proposal on Cockbum Sound Location 16, south of the Mandurah bypass road and immediately east of the bypass bridge. This is the same site as was proposed by John Holland Pty Ltd for the Waterside Mandurah Stage 2 Canal Estate, assessed by the Authority in 1982 and found to be environmentally acceptable subject to a number of recommendations, but never commenced. Following release of the EPA's report and recommendations, this... Read more...Last updated: December 21, 1991
Proposal to remove an estimated 295,650 m 3 of sand from a pastured hill which runs east-west along the northern boundary of Lot 242 Corio Road, Pinjarra. Read more...