This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 12, 2005
The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...Last updated: October 3, 2005
The proponent wishes to split the original proposal into two proposals, an ammonia plant and a urea plant. The approval to split the proposal was granted as a change to the proposal on 12 October 2005 under section 45C of the, Environmental Protection Act 1986, . The split of the proposal is based on commercial grounds and there are no changes to the capacities or other operational characteristics of the proposal as originally approved. The split of the proposal will result in each plant being... Read more...