This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 28, 2024
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: November 27, 2023
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: April 15, 2019
The proponent, Kelliher Bros. plan to expand their grass-fed beef production business from 6 weeks a year to year-round grazing. To achieve this, the proponent would like to trial the installation of a single 40 ha centre pivot irrigator for irrigating pasture within an area of Lot 209 Paterson Road, Ravenswood (88 ha). The proposal occurs within the, Environmental Protection Peel Inlet - Harvey Estuary Policy 1992, policy area. Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: September 21, 2018
This is the inquiry into a request for changes to Ministerial Statement 906 , relating to the Point Grey Marina. Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: September 14, 2000
The proposal is for the widespread distribution and use of bauxite residue from Alcoa of Australia's Kwinana, Wagerup and Pinjarra refineries for the purpose of soil amendment for the currently approved land use activities on the Swan Coastal Plain portion of the catchment of the Peel inlet and Harvey Estuary. This inquiry under s46 is in regard to a request for extension of approval time limit. Read more...Last updated: September 5, 1996
The proposal is to build and operate a rare earth plant on a site 4 km south of Alcoa Alumina Refinery and adjacent to the existing Rhone-Poulenc Gallium Plant at Pinjarra, approximately 100km south of Perth and 30 km south-east of Mandurah. The plant will produce 15,000 tonnes per annum (tpa) of solid rare earth nitrate concentrate. Read more...Last updated: December 14, 1994
The Department of Conservation and Land Management proposes (section 2) to realign the northern boundary of Yalgorup National Park, in the vicinity of Tims Thicket. This new boundary would exclude a portion of Reserve 21271 north of Tims Thicket Road, and include a portion of Reserve 24198 south of Tims Thicket Road Read more...Last updated: May 9, 1994
The proposal is for the first privately owned and operated landfill accepting general and municipal waste in Western Australia. Other privately owned and operated landfills in Western Australia have been restricted to land filling specific types of waste, such as builders rubble, clean fill or waste generated from particular industrial or manufacturing process. These landfills are typically approved by a local authority under sections of the Town Planning and Development Act and Local... Read more...