Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Wagoo Hills Vanadium Project and Mingenew Coal Project (s46) [1184] |
Attachment 1 to Statement 481 – Amendment of key proposal characteristics – change to proposal approved under s45C on 22 October 2007. Attachment 2 to Statement 481 – Production of iron ore – change to proposal approved under s45C on 30 August 2011. Attachment 3 to Statement 481 – Increase the ore extraction from 3,900,000 tpa to 4,500,000 tpa (increase of 600,000 tpa) – change to proposal approved under s45C on 10 December 2019. |
Ministerial Statement 481.pdf (PDF, 2.01 MB) | December 10, 2019 |
Yoongarillup Mineral Sands Project |
Attachment 1 to Statement 1030 - Increase the Life of Mine from three to four years - change to proposal approved under s45C on 10 December 2019. |
Ministerial Statement 1030.pdf (PDF, 3.11 MB) | December 10, 2019 |
Windimurra Vanadium Project: Land clearing and mining below the base of weathering |
Attachment 1 to Statement 773 - Revised land clearing requirements - change to proposal approved under s45C on 24 February 2009. Attachment 2 to Statement 773 – Additional land clearing – change to proposal approved under s45C on 23 August 2011. Attachment 3 to Statement 773 –
Change to proposal approved under s45C on 10 December 2019. |
Ministerial Statement 773.pdf (PDF, 4.11 MB) | December 10, 2019 |
Revised Iron Valley Iron Ore Project |
Attachment 1 to Ministerial Statement 1044 Proposed changes to the authorised extent of physical and operational elements within Schedule 1 of MS 1044:
Changes to proposal approved under s45C on 26 November 2019. |
Ministerial Statement 1044.pdf (PDF, 1.11 MB) | November 26, 2019 |
Solid Sodium Cyanide Plant Upgrade, Kwinana |
Attachment 1 to Statement 700 – Increase in the liquid sodium cyanide production capacity from 70,000 to 85,000 tonnes per annum (tpa). Minor changes to the solid sodium cyanide plant facilities to accurately reflect the requirements for achieving the currently approved production capacity of 45,000 tpa – change to proposal approved under section 45C on 4 February 2013. Attachment 2 to Statement 700 – Remove reference to the storage capacity of liquid sodium cyanide, the storage area for liquid sodium cyanide, and atmospheric emissions of ammonia and hydrogen cyanide and sodium cyanide (combined) – change to proposal approved under section 45C on 4 November 2014. Attachment 3 to Statement 700:
Changes to proposal approved under section 45C on 8 November 2019.
|
Ministerial Statement 700.pdf (PDF, 4.37 MB) | November 8, 2019 |
Kemerton wastewater treatment plant and treated wastewater reuse at woodlot |
Attachment 1 to Statement 568 - Changes: • Updated title and description to refer to Kemerton woodlot - Binningup woodlot deleted • Refined general description of the wastewater treatment plant (WWTP) • Location description of the WWTP is updated to the current cadastral data description • Removed references to the 2002, 2003 and 2004 projected treatment capacities - The current maximum treatment capacity (3.6 ML/day) is retained. • Removed references to treated wastewater quality parameters (now retained solely under Part V Licence L7802) • Removed reference to the 10 ML storage dam at Binningup and the 7.4 kilometre wastewater conveyance pipeline to Binningup, as neither will be constructed • Removed reference to Eaton - as Eaton’s wastewater is now directed to Bunbury WWTP • Removed reference to 60 ha woodlot at Binningup • Updated woodlot site details to reflect Kemerton woodlot - i.e general description, location, area (now 30ha) • Removed 10ML on-site treated wastewater storage dam (no longer required at Binningup) Changes to proposal approved under s45c on 1 October 2019 |
Ministerial Statement 568.pdf (PDF, 3.62 MB) | October 1, 2019 |
Koolan Island Iron Ore Mine and Port Facility |
Attachment 1 to Statement 715 - Increase in the accomodation capacity from 200 to 320 people approved under s45C on 2 April 2008. Attachment 2 to Statement 715 - Increase to the disturbance area from 540 hectares to 590 hectares - change to proposal approved under s45C on 4 Mar 2009. Attachment 3 to Statement 715 – Increase in groundwater abstraction from 75 kilolitres per day to 120 kilolitres per day of fresh water from existing bores, for potable use – change to proposal approved under s45C on 11 January 2012. Attachment 4 to Statement 715 – Increase to disturbance footprint from 590 ha to 650 ha – change to proposal approved under section 45C on 21 June 2012. Attachment 5 to Statement 715 – Increase to disturbance footprint from 650 ha to 655 ha – change to proposal approved under section 45C on 26 November 2014. Attachment 6 to Statement 715 - Reclamation, crushing and shipping of quartzite ore from waste dumps - change to proposal approved under section 45C on 20 May 2015. Attachment 7 to Statement 715 - Reconstruction of a portion of engineered seawall at Arbitration Cove; Dewatering approximately 25 GL of seawater from the inundated Main Pit at a rate of up to approximately 1,600 L/s; and Administrative change to amend total disturbance area for the proposal from approximately 655 ha” to “up to 670 ha” - change to proposal approved under section 45C on 13 April 2018. Attachment 8 to Statement 715 - Changes:
Change to proposal approved under section 45C on 20 August 2019. |
Ministerial Statement 715.pdf (PDF, 3.7 MB) | August 20, 2019 |
Christmas Creek Iron Ore Mine Expansion |
Attachment 1 to Statement 1033 - temporary presence of water in mining pits - change to proposal under s45C approved on 21 July 2017. Attachment 2 to Statement 1033 - Changes:
Change to proposal under s45C approved on 12 November 2018. Attachment 3 to Statement 1033 - Changes:
Change to proposal under s45C approved on 8 July 2019. |
Ministerial Statement 1033.pdf (PDF, 3.82 MB) | July 8, 2019 |
Pluto LNG Development (Site B Option), Burrup Peninsula |
Attachment 1 - increment of Pluto LNG development project disturbance footprint to allow for minor infrastructure reconfiguration and realignment, and for the addition of security fencing required due to the facility being classified as a site of Vital National Importance - s45C change to proposal approved on 6 May 2008. Attachment 2 - to include the construction of an Emergency Escape Route (walkpath) from Site B to Haul Road in the currently approved disturbance footprint of the proposal (as shown on Figure 5) - s45C change to proposal approved on 20 August 2009. Attachment 3 - To increase the land disturbance footprint of the proposal by 3.03 hectares - change to proposal approved under s45C on 29 March 2010. Attachment 5 - Changes:
Changes to proposal approved under section 45C on 1 July 2019. |
Ministerial Statement 757.pdf (PDF, 3.07 MB) | July 1, 2019 |
Ravensthorpe Nickel Project (s46) |
Attachment to Statement 633 – Redesign of the seawater intake facility – change to proposal approved under section 45C on 3 December 2004. Attachment 1 to Statement 633 – Increase the maximum allowable area of the evaporation pond from 250 hectares to 391 hectares – change to proposal approved under section 45C on 22 December 2008. Attachment 2 to Statement 633 – Construct and operate a Sands Reject Storage Facility - change to proposal approved under section 45C on 23 September 2010. Attachment 3 to Statement 633 – Increase in disturbance footprint of 282 ha and removal of elements considered not environmentally relevant or managed under other legislation – change to proposal approved under section 45C on 12 August 2014. Attachment 4 to Statement 633 - Changes:
Change to proposal approved under section 45C on 23 May 2019. |
Ministerial Statement 633.pdf (PDF, 7.46 MB) | May 23, 2019 |