S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Wagoo Hills Vanadium Project and Mingenew Coal Project (s46) [1184]

Attachment 1 to Statement 481 – Amendment of key proposal characteristics – change to proposal approved under s45C on 22 October 2007.

Attachment 2 to Statement 481 – Production of iron ore – change to proposal approved under s45C on 30 August 2011.

Attachment 3 to Statement 481 – Increase the ore extraction from 3,900,000 tpa to 4,500,000 tpa (increase of 600,000 tpa) – change to proposal approved under s45C on 10 December 2019.

Ministerial Statement 481.pdf (PDF, 2.01 MB) December 10, 2019
Yoongarillup Mineral Sands Project

Attachment 1 to Statement 1030 - Increase the Life of Mine from three to four years - change to proposal approved under s45C on 10 December 2019.

Ministerial Statement 1030.pdf (PDF, 3.11 MB) December 10, 2019
Windimurra Vanadium Project: Land clearing and mining below the base of weathering

Attachment 1 to Statement 773 - Revised land clearing requirements - change to proposal approved under s45C on 24 February 2009.

Attachment 2 to Statement 773 – Additional land clearing – change to proposal approved under s45C on 23 August 2011.

Attachment 3 to Statement 773

  • Increase width of the pit from 290 metres to 430 metres (increase of 140 metres).
  • Increase the depth of the pit from 90 metres to 150 metres (increase of 60 metres).
  • Increase the total disturbance area and vegetation clearing from 610 hectares to 815 hectares (increase of 205 hectares). 

Change to proposal approved under s45C on 10 December 2019.

Ministerial Statement 773.pdf (PDF, 4.11 MB) December 10, 2019
Revised Iron Valley Iron Ore Project

Attachment 1 to Ministerial Statement 1044

Proposed changes to the authorised extent of physical and operational elements within Schedule 1 of MS 1044:

  • Increase water abstraction of groundwater from 23 GL/a to 42 GL/a.
  • Increase surface discharge of surplus dewatering water to Weeli Wolli Creek from 17 GL/a to 42 GL/a.
  • Removing Pit C from the original activity description.

Changes to proposal approved under s45C on 26 November 2019.

Ministerial Statement 1044.pdf (PDF, 1.11 MB) November 26, 2019
Solid Sodium Cyanide Plant Upgrade, Kwinana

Attachment 1 to Statement 700 – Increase in the liquid sodium cyanide production capacity from 70,000 to 85,000 tonnes per annum (tpa). Minor changes to the solid sodium cyanide plant facilities to accurately reflect the requirements for achieving the currently approved production capacity of 45,000 tpa – change to proposal approved under section 45C on 4 February 2013.

Attachment 2 to Statement 700 – Remove reference to the storage capacity of liquid sodium cyanide, the storage area for liquid sodium cyanide, and atmospheric emissions of ammonia and hydrogen cyanide and sodium cyanide (combined) – change to proposal approved under section 45C on 4 November 2014.

Attachment 3 to Statement 700:

  • Increase capacity of total liquid sodium cyanide production from 85,000 tonnes per annum (tpa) to 91,000 tpa
  • Removal of the following elements from the key characteristics table:
    • Location
    • Inputs (Solid Sodium Cyanide Plant)
    • Outputs (Solid Sodium Cyanide Plant)
    • Transport (Liquid Sodium Cyanide Plant and Solid Sodium Cyanide Plant)
  • Updated Figure 1: Regional Location and Figure 2: Site Layout

Changes to proposal approved under section 45C on 8 November 2019.

 

Ministerial Statement 700.pdf (PDF, 4.37 MB) November 8, 2019
Kemerton wastewater treatment plant and treated wastewater reuse at woodlot

Attachment 1 to Statement 568 - Changes:

• Updated title and description to refer to Kemerton woodlot - Binningup woodlot deleted

• Refined general description of the wastewater treatment plant (WWTP) • Location description of the WWTP is updated to the current cadastral data description

• Removed references to the 2002, 2003 and 2004 projected treatment capacities - The current maximum treatment capacity (3.6 ML/day) is retained.

• Removed references to treated wastewater quality parameters (now retained solely under Part V Licence L7802)

• Removed reference to the 10 ML storage dam at Binningup and the 7.4 kilometre wastewater conveyance pipeline to Binningup, as neither will be constructed

• Removed reference to Eaton - as Eaton’s wastewater is now directed to Bunbury WWTP • Removed reference to 60 ha woodlot at Binningup

• Updated woodlot site details to reflect Kemerton woodlot - i.e general description, location, area (now 30ha)

• Removed 10ML on-site treated wastewater storage dam (no longer required at Binningup)

Changes to proposal approved under s45c on 1 October 2019

Ministerial Statement 568.pdf (PDF, 3.62 MB) October 1, 2019
Koolan Island Iron Ore Mine and Port Facility

Attachment 1 to Statement 715 - Increase in the accomodation capacity from 200 to 320 people approved under s45C on 2 April 2008.

Attachment 2 to Statement 715 - Increase to the disturbance area from 540 hectares to 590 hectares - change to proposal approved under s45C on 4 Mar 2009.

Attachment 3 to Statement 715 – Increase in groundwater abstraction from 75 kilolitres per day to 120 kilolitres per day of fresh water from existing bores, for potable use – change to proposal approved under s45C on 11 January 2012.

Attachment 4 to Statement 715 – Increase to disturbance footprint from 590 ha to 650 ha – change to proposal approved under section 45C on 21 June 2012.

Attachment 5 to Statement 715 – Increase to disturbance footprint from 650 ha to 655 ha – change to proposal approved under section 45C on 26 November 2014.

Attachment 6 to Statement 715 - Reclamation, crushing and shipping of quartzite ore from waste dumps - change to proposal approved under section 45C on 20 May 2015.

Attachment 7 to Statement 715 - Reconstruction of a portion of engineered seawall at Arbitration Cove; Dewatering approximately 25 GL of seawater from the inundated Main Pit at a rate of up to approximately 1,600 L/s; and Administrative change to amend total disturbance area for the proposal from approximately 655 ha” to “up to 670 ha” - change to proposal approved under section 45C on 13 April 2018.

Attachment 8 to Statement 715 - Changes:

  • Include airfield as part of the infrastructure required
  • Minor (<1ha) change to KIO disturbance footprint at the site of the proposed airstrip to be offset with the exclusion of an equivalent sized area.

Change to proposal approved under section 45C on 20 August 2019.

Ministerial Statement 715.pdf (PDF, 3.7 MB) August 20, 2019
Christmas Creek Iron Ore Mine Expansion

Attachment 1 to Statement 1033 - temporary presence of water in mining pits - change to proposal under s45C approved on 21 July 2017.

Attachment 2 to Statement 1033 - Changes:

  • Expansion of the Christmas Creek Mine Development Envelope (Depicted by the red line within Figures 1 to 4 of Schedule 1); and
  • Changes to the clearing of locally significant vegetation in Table 2 of Schedule 1.

Change to proposal under s45C approved on 12 November 2018.

Attachment 3 to Statement 1033 - Changes:

  • Changes to Table 2, removing the time limit for the temporary presence of water in mining pits.
  • Approval of presence of water in inactive mine pits.
  • Below water table pits are required to be backfilled at cessation of mining to a level which will not allow the formation of permanent lakes.

Change to proposal under s45C approved on 8 July 2019.

Ministerial Statement 1033.pdf (PDF, 3.82 MB) July 8, 2019
Pluto LNG Development (Site B Option), Burrup Peninsula

Attachment 1 - increment of Pluto LNG development project disturbance footprint to allow for minor infrastructure reconfiguration and realignment, and for the addition of security fencing required due to the facility being classified as a site of Vital National Importance - s45C change to proposal approved on 6 May 2008.

Attachment 2 - to include the construction of an Emergency Escape Route (walkpath) from Site B to Haul Road in the currently approved disturbance footprint of the proposal (as shown on Figure 5) - s45C change to proposal approved on 20 August 2009.

Attachment 3 - To increase the land disturbance footprint of the proposal by 3.03 hectares - change to proposal approved under s45C on 29 March 2010.

Attachment 5 - Changes:

  • Deletion of the described gas field from the Proposal preamble, to clarify that gas from other fields can be processed at Pluto LNG (as per the Public Environmental Review);
  • Deletion of the described gas turbine types used to drive the liquefaction compressors and for power generation from Schedule 1, to allow for greater flexibility in turbine design;
  • Inclusion of gas export via shipping, trucking or piping to Schedule 1, to reflect the existence of the Pluto LNG trucking facility and proposed Pluto-North West Shelf Interconnector.
  • Deletion of the described gas field Pluto North West Shelf from the Proposal Schedule 1 to gas fields.

 Changes to proposal approved under section 45C on 1 July 2019.

Ministerial Statement 757.pdf (PDF, 3.07 MB) July 1, 2019
Ravensthorpe Nickel Project (s46)

Attachment to Statement 633 – Redesign of the seawater intake facility – change to proposal approved under section 45C on 3 December 2004.

Attachment 1 to Statement 633 – Increase the maximum allowable area of the evaporation pond from 250 hectares to 391 hectares – change to proposal approved under section 45C on 22 December 2008.

Attachment 2 to Statement 633 – Construct and operate a Sands Reject Storage Facility - change to proposal approved under section 45C on 23 September 2010.

Attachment 3 to Statement 633 – Increase in disturbance footprint of 282 ha and removal of elements considered not environmentally relevant or managed under other legislation – change to proposal approved under section 45C on 12 August 2014.

Attachment 4 to Statement 633 - Changes:

  • Administrative changes to better define the proposal in schedule 1
  • Define development envelopes and combining project elements to allow flexibility in implementation, without increasing the authorised extent
  • Include the access corridor (from Shoemaker-Levy to the process plant) to the authorised extent table
  • Include the seawater pipeline and intake to the authorised extent table
  • Add 289 hectares of cleared farmland for topsoil stockpiles, access tracks and miscellaneous infrastructure to the authorised extent table
  • Amend the boundaries of the Halleys pit, Halleys overburden storage area and Hale- Bopp pit to incorporate historical clearing of native vegetation, without increasing the total authorised clearing extent
  • Include the limestone quarry to Figure 1.
  • Minor variation to the alignment of the access corridor in Figure 2
  • Consistent naming of project elements between the tables and figures
  • Remove elements that are duplicated.

Change to proposal approved under section 45C on 23 May 2019.

Ministerial Statement 633.pdf (PDF, 7.46 MB) May 23, 2019