West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Project
Proposal description

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore.

Assessment Number
1767
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
3. Assessment
4. EPA Report on assessment
EPA Report Number
1409
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016.

Date of approval
Post-assessment changes
Comments

In July 2014, Aquila Resources Ltd was acquired by Baosteel Resources Australia Pty Ltd and Aurizon Operations Limited. A revised implementation model for the project has been developed based on separate corporate entities being responsible for implementing the mine and rail infrastructure components of the project.

In August 2015, API Management Pty Ltd (API) submitted a request for a change to the proposal and Ministerial Statement under Sections 45C and 46 of the EP Act, requesting that the Ministerial Statement be separated into two for the mine and rail infrastructure components. This would include separating the development envelope into a mine development envelope and rail infrastructure development envelope. The change also involves minor amendments to the areas of disturbance and development envelopes. This results in a 67 hectare (ha) reduction to the total area of disturbance.