Ocean outlet for treated wastewater, Bunbury wastewater treatment plant

Project
Proponent
Proposal description

The proposal is for the construction and operation of an ocean outlet and associated infrastructure, for the Bunbury wastewater treatment plant. The outlet extends approximately 1.7 kilometres from the shoreline adjacent to the plant, for the disposal of treated wastewater

Assessment Number
1302
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
1021
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 572 - Increase of the total allowable annual load of Total Nitrogen (TN) from 60 to 70 t/a – change to proposal approved by the EPA Chairman on a temporary basis, such that the increase in TN load limit would cover only the period of time required to complete the Wastewater Treatment Plan upgrade – change to proposal approved on 18 November 2008.

Attachment 2 to Statement 572 - Removal of the Total Phosphorous (TP) limit of 10 mg/l and including it in Part V Licence and removal of the faecal coliform limit of <10,000 cfu/ 100ml as from a marine perspective this specific value is not relevant and monitoring of the bacterial levels in ocean outfall sample is addressed in Part V Licence – change to proposal approved on 22 April 2014.

Date of approval s. 45C