Ravensthorpe Nickel Project Revised Proposal

Project
Proposal description

FQM Australia Nickel Pty Ltd proposes to change and expand its Ravensthorpe Nickel Operations near Bandalup Hill currently approved under Ministerial Statement 633 as follows:

  • Expand Hale-Bopp mining operations by approximately 29 hectares into the Kunzea similis ssp. mediterranea Community Conservation Area.
  • Revise the alignment of the infrastructure corridor between the Shoemaker-Levy ore body and the processing area.
  • Incorporate neutralised tailings to the reject rocks used to backfill mine pits and re-establish hill topographies.

Following the decision to assess this proposal, the EPA consented to a change to the proposal under s43A of the Environmental Protection Act 1986 as follows:

  • Expanding disturbance of native vegetation around the already approved disturbance area at Shoemaker-Levy by 220 ha.
Assessment Number
2100
Referred under EP Act
s38
Industry sector
Last updated
1. Referral
2. Decision on whether to assess this proposal
Chair's Determination
Preliminary Environmental Factors
Date published
3. Assessment
Scoping
Approved
Environmental Review
Change to proposal during assessment under s. 43A
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email