Roe Highway Stage 7 Extension (South Street, Canning Vale to Kwinana Freeway, Leeming)

Project
Proposal description

The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha).

Approximately 53.9 ha of this area will be cleared in two stages: i) Stage A – in the areas required for bridge construction at South Street, Karel Avenue and Kwinana Freeway, and for the section of highway between Karel Ave and Kwinana Freeway; and ii) Stage B – the remainder of the areas, following translocation of Caladenia huegelii individuals. The remaining 8.1 ha is existing degraded land.

Assessment Number
1466
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1138
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation - change to proposal under s45C approved on 22 September 2005.

Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation. Change to offset package - change to proposal under s45C approved on 11 October 2009.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email