Sandy Ridge Facility – Alignment of Gate Waste Acceptance Tonnage

Project
Proposal description

Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. 

The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078

Assessment Number
2309
Referred under EP Act
s38
Last updated
1. Referral
Referral documentation
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Approved
Environmental Review
Date Published (Environmental Review documentation)
Proponent response to submissions
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1767
Date published
Appeals close
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email