Temporary relocation of Total Waste Management’s evaporation ponds to the Mungari Industrial Estate

Project
Proponent
Proposal description

The proposal is for the construction and operation (on a temporary basis) of six evaporation ponds (120m × 30m) in the north-eastern corner of the Mungari Industrial Estate in the Shire of Coolgardie.

The effluent to be evaporated at the Mungari site will be sourced from Total Waste Management’s liquid waste treatment facility in Boulder. The effluent has a chemical oxygen demand (COD) in the range 20,000- 25,000 mg/L and a total dissolved solids (TDS) content ranging from 20,000 to 40,000 mg/L (GHD, 2005). The waste stream will comprise treated levels of wastes such as grease trap, oil wastes, paints and resins, organics, and acids remaining in the effluent following treatment.

Assessment Number
1556
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Date published
4. EPA Report on assessment
EPA Report Number
1167
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email