Wagerup Alumina Refinery - Increase in Production to 4.7 Mtpa; and Wagerup Cogeneration Plant

Project
Proposal description

Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit.

The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency.

As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the Refinery’s current EP Act Part V licence is 2.5 Mtpa.

Assessment Number
1527
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
1215
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Ministerial Statement 728 dated 14 September 2006 as amended by Ministerial Statement 897 dated 9 May 2012.

Date of approval
Post-assessment changes
Comments

These Interim Implementation Conditions are to be read in conjunction with Statement 728 and are to have effect until a further statement is published under section 45(5) as applied by section 46(8) of the Environmental Protection Act 1986. All other conditions of Statement 728 continue to have effect.

Date of approval (46a)