Home > Printer-friendly > Printer-friendly > Leslie Salt project, expansion of ponds, Port Hedland

Leslie Salt project, expansion of ponds, Port Hedland

Project
Proponent: 
Leslie Salt
Proposal description: 

The proposal is to expand an existing salt mining operation by constructing a new primary concentration pond (which would lie outside the existing mining leases) and additional brine, bitterns and crystallization ponds within the existing leases.

The current operation is located on coastal flats near Port Hedland with the primary concentration ponds 30 km to the east and the brine ponds 10 km to the east connected by an aqueduct. Once the brine is fully saturated it is pumped to crystallisation ponds at the main plant, which is on the outskirts of Port Hedland, for harvesting and trucking to the port for shipment.

The current mining operation is regulated by the Leslie Solar Salt Industry Agreement Act which was declared in July 1966, and, under that Act, is regulated by the Mining Act. The present lease expires in 1997, after which two renewals of 21 and 11 years can be negotiated.

Assessment Number: 
376
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Salt
Last updated: 
December 21, 2022
Current Status: 
Ministerial Statement published
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination: 
Consultative Environmental Review
Date published: 
Friday, 9 March, 1990
3. Assessment
Scoping
Approved: 
Tuesday, 6 March, 1990
Environmental Review
Public submissions: 
Wednesday, 1 August, 1990 to Wednesday, 29 August, 1990
Environmental Review documentation: 
PDF icon Consultative Environmental Review document
4. EPA Report on assessment
EPA Report Number: 
506
EPA Report: 
PDF icon Leslie Salt project, expansion of ponds, Port Hedland
Date published: 
Friday, 22 March, 1991
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Friday, 21 June, 1991
Ministerial Statement: 
PDF icon MS 147.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 147 - Increase in salt production to 3.2 million tonnes per annum. Section 45C change to proposal approved on 27 October 2004.

Attachment 2 to Statement 147 - Increase in salt production from 3.2 million tonnes per annum to approximately 4.5 million tonnes per annum for approximately 2 years from the start of mining. Section 45C change to proposal approved on 13 July 2005.

Attachment 3 to Statement 147 - Changes to Table 1, Schedule 1 - Key Characteristics Table. Section 45C change to proposal approved on 10 December 2013.

Attachment 4 to Statement 147 - Change to Bitterns Discharge Volume. Section 45C change to proposal approved on 23 April 2018.

Attachment 5 to Statement 147 - Removal of the 3.2 million tonnes per annum solar salt production limit from Attachment 4 of MS 147. Amendment to correct typographic error.. Section 45C change to proposal approved on 22 December 2022.

Date of approval s. 45C: 
Wednesday, 27 October, 2004
Wednesday, 13 July, 2005
Tuesday, 10 December, 2013
Monday, 23 April, 2018
Thursday, 22 December, 2022

Source URL:https://www.epa.wa.gov.au/proposals/leslie-salt-project-expansion-ponds-port-hedland