This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 6, 1996
The proposal is to dredge two channels to connect the Swan River with an internal artificial water body. Construction of the channel will involve: dredging of one 15m wide, 1 m deep channel through the System 6 area and near shore sandbars at the northern end of the wetland; the excavation of a 55m wide channel to -2.5m AHD, through the southern end of the tip site; plus the dredging of a 320m long, 55m wide navigation channel to -2.5m AHD through river shallows to connect with the main deep... Read more...Last updated: October 22, 1996
The proposal is to develop a nickel/cobalt ore mining and processing operation 50km north-west of Kalgoorlie and 9km east of Ora Banda. Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...Last updated: May 8, 1996
The proposal is to develop an upgraded tailings storage facility (TSF) at the Mt Keith nickel mine, located approximately 100 kilometres north of Leinster in the north-eastern Goldfields region of Western Australia Mining. Processing of nickel ore commenced at Mt Keith in 1994. To date, two conventional paddock storage type tailings cells have been used to store tailings, and the proponent has approval to construct an additional two cells. In 1990, a feasibility study into centralised thickened... Read more...Last updated: March 1, 1996
The Tony Scolaro Family Trust intends to redevelop an existing caravan park into a Park Home Estate. The proposal will involve the construction of new infrastructure including 120 park homes (demountable houses), associated access roads, a new wastewater treatment plan and infiltration areas for stormwater and treated wastewater. Read more...