This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 26, 1997
Mrs A MMW Bennett proposes to dredge a portion of the Swan River to provide access for a 25 m long motor boat to an underground private boatshed at Lot 55 Saunders Street Mosman Park. Access to the boatshed would involve cutting a channel through a portion of foreshore land privately owned to High Water Mark but reserved for 'Parks and Recreation'. Public access is proposed to be maintained along the foreshore across the channel via swing footbridge. Read more...Last updated: May 21, 1997
The proposal is to develop five 40ha centre pivot irrigation sites. The five centre pivot sites, in addition to an existing centre pivot site, will result in a total of six centre pivot sites on the property with a total area of 240ha. Only three of the six pivot sites will be used for horticulture at any time. The application for a groundwater licence to irrigate 80 hectares of land (two centre pivot sites) was referred to the EPA by the Water and Rivers Commission on the 29 July 1996 for... Read more...Last updated: May 19, 1997
The proposal is to to expand NufarmCoogee Pty Ltd's Chlor-alkali Plant at Kwinana to allow an increase in chlorine gas production to 42,000 tonnes per annum (tpa) through the installation of a new electrolysis processing circuit. Storage of chlorine held on site will rise from a nominal 50 tonnes to 150 tonnes. Read more...Last updated: May 16, 1997
The proposal is to redevelop the Marlston Hill site north of the Bunbury CBD for residential purposes. The site has been used previously for industrial purposes including storage of petroleum products, railway workshops, a sewage treatment plant and grain storage facilities. This inquiry under s46 is related to the EPA's previous assessment of the Bunbury Harbour City Development authorised by Ministerial Statement 306 . Read more...Last updated: May 6, 1997
The Murrin Murrin nickel cobalt project was originally assessed at the level of a Consultative Environmental Review, with the EPA providing its report and recommendations to the Minister for the Environment in May 1996. Approval to implement the project, subject to a number of Environmental Conditions, was issued on 5 June 1996. In August 1996 Anaconda Nickel referred proposals to the EPA to modify components to the project, and to locate certain project facilities at alternate sites. The... Read more...Last updated: April 24, 1997
The proposal is to extend the existing breakwater in the northern precinct of Jervoise Bay. In summary, the breakwater extension will: commence immediately west of the Cockburn Power Boat Association facility, be 700 metres (m) long, approximately 40m wide, and cover 2.8 hectares (ha) of seabed; be constructed of limestone rubble mound, as used in the existing breakwater and has an expected construction period of 40 weeks; and form a harbour with an entrance width of 120m at mean sea level. Read more...Last updated: April 17, 1997
The proposal is to develop a titanium minerals mine on Mining Leases 70/49, 70/937 and 70/938 and to mine an ore body located on Reserve 31900 and private property within the Shire of Harvey. The ore body consists of two occurrences of heavy mineral concentrate separated by the Waterous Formation Creek, and adjacent to Black Rock Road. Read more...Last updated: March 14, 1997
Main Roads Western Australia proposes to reconstruct the existing two lanes into a four lane carriageway at the Bedfordale Hill section of Albany Highway between the end of the existing dual carriageway and the road train assembly area in the City of Armadale. The earthworks for the proposed carriageway encroach onto Bungendore Park which is part of System 6 Recommendation MSO - Darling Scarp. The proposal also involves the deviation of Neerigen Brook in two locations. Read more...Last updated: February 17, 1997
The proposal is to extend the pit of the Nickol Bay Quarry along the Pistol Range within an area covered by Mining Leases M47/306, M47/331, M47/309, and M47/353. The proposal does not alter the nature of quarry operations carried out at the Nickol Bay Quarry. Read more...Last updated: February 6, 1997
The Gnangara Mound Groundwater Resources proposal (Pinjar ground water extraction Stage 1) was proposed by the Water Authority of WA (WAWA) in 1986, assessed by the EPA as an Environmental Review and Management Programme (ERMP) and approved by the Minister for the Environment in 1988 subject to the Minister's Environmental Conditions. The ERMP addressed a range of issues concerning the overall management of ground water resources on the Gnangara Mound, taking into account the requirements... Read more...Last updated: January 17, 1997
Mr P G Patterson proposes to mine gypsum sand from the dunes along the southern edge of Lake Chinocup, within the Chinocup A Class Nature Reserve. Lake Chinocup is 25km east of Nyabing, the local government centre for the Shire of Kent, and 10km west of Pingrup. Read more...