This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 13, 2018
The Shire of Esperance proposes to develop a new Waste Management Facility (WMF) at Lot 12 Kirwan Road, Merivale. The proposed WMF will be a 17 ha Class III Putrescible Landfill with a lifespan of 30 years. Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: October 15, 2018
Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...Last updated: September 25, 2018
Rosslyn Hill Mining Pty Ltd is proposing to expand their operations at Paroo Station to install a hydrometallurgical facility to convert lead carbonate concentrate to lead metal (ingots). The proposal is located 30 km west of Wiluna (Shire of Wiluna). The proposal includes an additional clearing of approximately 400 hectares, and the exportation of the product through the Port of Fremantle. Read more...Last updated: September 21, 2018
This is the inquiry into a request for changes to Ministerial Statement 906 , relating to the Point Grey Marina. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: April 9, 2018
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...Last updated: December 13, 2017
The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: June 22, 2017
Proposal by BHP Iron Ore Pty Ltd to develop 14 iron ore deposits at Mining Area C-Northern Flank, 100 km north west of Newman. Read more...Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: December 30, 2016
The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps). Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 7, 2016
The proposal is to clear some portion of Kent Location 1858 for agricultural purposes. The exact area of proposed clearing has changed as the proponent has made further submissions to the State Administrative Tribunal. It is understood that the proponent’s current application is to clear approximately 65 hectares of native vegetation. Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: December 6, 2016
The proposal is to construct a single residence on Lot 1613 Barrett Street, Southern River. The proposal includes a residence, garage, swimming pool, stables, paddocks, access way and landscaping with an ornamental lake. Read more...