This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 24, 2024
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: April 22, 2024
The proposal is to operate the Beenyup Wastewater Ocean Outlets into Marmion Marine Park that are associated with the Beenyup Wastewater Treatment Plant and Advanced Water Recycling Plant. Read more...Last updated: April 19, 2024
The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: November 6, 2023
The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...Last updated: September 27, 2023
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 3, 2023
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: November 8, 2022
Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...Last updated: October 24, 2022
The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...Last updated: August 29, 2022
The proposal is for the development of residential, commercial and public open space land uses, a single entrance marina and the management of conservation areas on Lot 5000 and Part Lot 5001 Pipidinny Road and Part Lot 9005 Marmion Ave, Eglinton. The EPA's report on the assessment was published as Bulletin 500, and Ministerial Statement 150 was published on 8 July 1991. In March 2013, Eglinton Estates Pty Ltd wrote to the EPA requesting minor amendments to the existing Implementation... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: May 25, 2022
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...