Project Proponent Tectonic Resources NL Proposal description The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Assessment Number 1618 Region Goldfields Esperance Referred under EP Act s38 Industry sector Gold Last updated March 28, 2006 Current Status Ministerial Statement published 1. Referral Referral documentation Environmental Protection Statement (December 2005) (PDF, 26.05 MB) Appendix A Letters from Shire and Landowners (ZIP, 1.94 MB) Appendix B GCA - Geochemical Characterisation- Kundip and Trilogy (PDF, 4.76 MB) Appendix C OES - Topsoil Characterisation at Kundip and Trilogy (PDF, 1.4 MB) Appendix D Hydrology and surface water quality (PDF, 3.05 MB) Appendix E Hydrology and groundwater (PDF, 4.13 MB) Appendix F Vegetation and Flora (PDF, 14.72 MB) Appendix G OES - Trilogy Baseline Flora survey (PDF, 1.7 MB) Appendix H Fauna studies and decision on MNES (PDF, 3.05 MB) Appendix I Brad Goode Aboriginal Heritage Survey (PDF, 8.81 MB) Appendix J Tamora - Aboriginal Heritage Survey (PDF, 5.11 MB) Appendix K Department of Indigenous Affairs correspondence (ZIP, 3.51 MB) Appendix L Correspondence to and from the Heritage Council of WA (PDF, 1.56 MB) Appendix M Process Facility (PDF, 133.7 KB) Appendix N SRE Tailings Storage Facility NOI (PDF, 435.28 KB) Appendix O Preliminary Geotechnical Assessment (slope design parameters) (PDF, 327.3 KB) Appendix P Adjustments to wall design parameters (PDF, 347 KB) Appendix Q Geochemical Characteristics Process Tailings Slurry (PDF, 1.64 MB) Appendix R SRE Trilogy Water Storage Facility NOI (PDF, 339.96 KB) Appendix S Draft Trilogy Rehabilitation and Preliminary Closure Management Plan (PDF, 1.23 MB) Appendix T Kundip Water Storage Facility NOI (PDF, 246.47 KB) Appendix U Draft Kundip Rehabilitation and Preliminary Closure Management Plan (PDF, 732.65 KB) Appendix V Modelling Effects of Tailings Emplacement (PDF, 1.72 MB) Appendix W RAV 8 Site Water Balance (PDF, 45.78 KB) Appendix X Impact of pit seepage (PDF, 126.55 KB) Appendix Y Baseline Dust Monitoring - Kundip (PDF, 631.27 KB) 2. Decision on whether to assess this proposal Chair's Determination Environmental Protection Statement (EPS) Preliminary Environmental Factors Flora and Vegetation Terrestrial Fauna Hydrological Processes Inland Waters Environmental Quality Date published Thursday, 5 January, 2006 4. EPA Report on assessment EPA Report Number 1213 EPA Report Phillips River Gold Project, Ravensthorpe (PDF, 8.22 MB) Date published Thursday, 5 January, 2006 Appeals close Thursday, 19 January, 2006 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Wednesday, 22 March, 2006 Ministerial Statement Ministerial Statement 716 (PDF, 1.22 MB)