0721 - Pilbara Iron Ore and infrastructure project: Cloud Break No Beneficiation

Information: 

Attachment 1 - Increase of dewatering to up to 25 GL/a, and reinjection to up to 18 GL/a - s45C change to proposal (as shown in Figure 4), approved on 25 September 2009.

Attachment 2 - Amend the layout of the Cloud Break mine-site footprint (as shown in figure 5) and increase reinjection from 18 gigalitres to 20 gigalitres per annum - change to proposal approved under s45C on 12 July 2010.

Attachment 3 – Increasing mine dewatering from 25 gigalitres per annum to 30 gigalitres and water injection from 20 gigalitres to 25 gigalitres and amend the annual rate of production – change to proposal approved under s45C on 10 June 2011.

Ministerial Statement File: 
Date of approval: 
April 24, 2006