Pilbara Iron Ore and Infrastructure Project: Port and North-South Railway (Stage A)

Attachment 1 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 6 April 2006.

Attachment 2 to Statement 690 - Additional clearance for temporary access road - 45C change to proposal approved on 17 August 2006.

Attachment 3 to Statement 690 - Additional infrastructure listed as part of Rail Loop and Railway Alignment - 45C change to proposal approved on 12 September 2006.

Attachment 4 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 27 April 2007.

Attachment 5 to Statement 690 - Description of conveyors as uncovered - 45C change to proposal approved on 4 April 2008.

Attachment 6 to Statement 690 - Extension of construction period and addition of two car dumpers - 45C change to proposal approved on 7 August 2008.

Attachment 7 to Statement 690 - Additional rail infrastructure and associated clearance of an additional 606 hectares - 45C change to proposal approved on 17 December 2009.

Attachment 8 to Statement 690 - Increase in railway corridor disturbance (371 hectares) due to construction of additional infrastructure, increase in port operating area (3 hectares) due to widening of causeway – section 45C change to proposal approved on 21 August 2011.

Attachment 9 to Statement 690 – Remove and amend the port elements of Schedule 1 to include wharf AP5, and removal of references to export tonnage in Schedule 1 – change to proposal approved under section 45C on 6 February 2014.

Ministerial Statement 690 (PDF, 3.29 MB)
West Angelas Iron Ore Project

Attachment to Statement 514 - Increase mining rate from 25 million tonnes per annum to approximately 30 million tonnes per annum - change to proposal approved on 11 April 2006.

Attachment 1 to Statement 514 - Additional rail siding, Spoonbill - change to proposal approved on 29 November 2006.

Attachment 2 to Statement 514 - Change to the rail alignment along Hamersley Flats - change to proposal approved on 13 February 2009.

Attachment 3 to Statement 514 - increase throughput to 40 million tonnes per annum, update of mine figure (Figure 10) and amendments to Key Characteristics Table - s45C change to proposal approved on 20 August 2009.

Attachment 4 to Statement 514 – Deepening of existing pits and addition of Pit E – change to proposal approved under section 45C on 30 January 2012.

Attachment 5 to Statement 514 – Amendment to proposal description and deletion of the key characteristics from Schedule 1 which are not relevant to the environment or managed by another process – change to proposal approved under section 45C on 16 January 2014.

Ministerial Statement 514 (PDF, 5.34 MB)
Western Turner Syncline - Section 10 Iron Ore Mine

Attachment 1 to Statement 807 – Removal of Water Supply and Production Limits – change to proposal approved under section 45C on 10 December 2013.

Ministerial Statement 807 (PDF, 966.67 KB)
Yilgarn Operations - Windarling Range W4 East Deposit

Attachment 1 – Extension to the area of the W4 East Deposit Haul Road and revision of proposal description – change to proposal approved under section 45C on 20 November 2013.

Ministerial Statement 909 - Yilgarn Operations - Windarling Range W4 East Deposit (PDF, 2.43 MB)
Koolyanobbing Iron Ore Expansion

Attachment 1 to Statement 627 – In schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 5 May 2005.

Attachment 2 to Statement 627 – Increase in area of native vegetation clearing at the Windarling W3/5 pit area by 52.9 hectares to develop a new waste dump (47.9 hectares with maximum height of 540m AHD) and extend the area for stock piling (5 hectares) – change to proposal approved under s45C on 11 March 2008.

Attachment 4 to Statement 627 – An increase in ore production of 10/% – change to proposal approved under s45C on 7 October 2008.

Attachment 5 to Statement 627 – Increase ore production at the ore handling plant at Koolyanobbing from 8.8 million tonnes per annum up to 11.5 million tonnes per annum – change to proposal approved under s45C on 20 August 2010.

Attachment 6 to Statement 627 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011.

Attachment 7 to Statement 627 – Reduction of project impacts to Declared Rare Flora – change to proposal approved under section 45C on 25 September 2012.

Attachment 8 to Statement 627 – Increase in disturbance footprint of 45 ha at Windarling to allow for stockpiling of topsoil, subsoil and vegetation materials to be used in future rehabilitation – change to proposal approved under section 45C on 12 October 2012.

Attachment 9 to Statement 627 – Mining of Windarling Range W1 deposit below the groundwater table – change to proposal approved under section 45C on 20 November 2012.

Attachment 10 to Statement 627 – Increase to Windarling W4 West waste rock dump area and ore stockpile area – change to proposal approved under section 45C on 20 November 2013.

Ministerial Statement 627 (PDF, 14.67 MB)
South West Creek Dredging and Reclamation Proposal

Attachment 1 to Statement 859 – Relocation of DMMA G Discharge Point and Modification of Zone of Permanent Mangrove loss - change to proposal approved under s45C on 27 October 2011.

Attachment 2 to Statement 859 – Realignment of the access track between Utah Point Road and the dredging area, and associated changes to the zone of permanent mangrove loss – change to proposal approved under s45C on 2 May 2012.

Ministerial Statement 859 (PDF, 5.32 MB)
Yilgarn Operations Deception Deposit

Attachment 1 to Statement 900 – Realignment of the Deception Deposit Haul Road and the siting of the Deception Deposit Waste Rock Landform – change to proposal approved under section 45C on 19 November 2012.

Attachment 2 to Statement 900 – Realignment of Haul Road, co-location of support infrastructure to Ore Stockpile areas – change to proposal approved under section 45C on 5 November 2013.

Ministerial Statement 900 (PDF, 4.25 MB)
Goldsworthy Iron Ore Mines Extension Project

Attachment to Statement 682 – Change to description of proposal by removing Y4A from the main activity and increasing area disturbed from 97 to 145 hectares (ha) – change to proposal approved under section 45C on 8 June 2006.

Attachment 2 to Statement 682 – Revised proposal description and removal of Location, Duration and Employment from the key proposal characteristics; increase the area of disturbance from approximately 145 to 270 ha, and formalise new Maximum Disturbance Boundaries (Development Envelope) of approximately of 455 ha for the site – change to proposal approved under section 45C on 9 October 2013.

Ministerial Statement 682 (PDF, 1.43 MB)
Port Geographe - Stage 1 (s46)

Attachment to Statement 391 - Modifications to beach alignments at Wonnerup Beach - s45C change to proposal approved on 19 September 2006.

Attachment 2 to Statement 391 - To harvest wrack for a two-year trial period between Guerin Street groyne and the western breakwater of the Port Geographe development - s45C change to proposal approved on 15 May 2009.

Attachment 3 to Statement 391 – To define the spatial components of the Port Geographe Development, identifying the Land Development Component and the Coastal Structures Component – change to proposal approved under section 45C on 5 February 2013.

Attachment 4 to Statement 391 – Delete Figure 1 and replace with a revised Figure 1 (March 2013). Provide a conceptual layout of coastal structures (Figure 2). Provide the key characteristics of the proposal (Table 1) – change to proposal approved under section 45C on 12 April 2013.

Attachment 5 to Statement 391 – To amend the channel dimensions and excavation work in the Key Characteristics Table change to proposal approved under section 45C on 13 September 2013.

Ministerial Statement 391 (PDF, 3.99 MB)
Brockman 2 Detrital Iron Ore Mine Extension Phase 2B

Attachment 1 to Statement 867– Removal of reference to "Project life", "Total Production", and "Dewatering volume"– change to proposal approved under section 45C on 11 September 2013.

Statement 867 - Brockman 2 Detrital Iron Ore Mine Extension Phase 2B (PDF, 420.94 KB)