Scarborough Project Nearshore Component

Project
Proposal description

The Proposal would include the following activities:

  • shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths
  • preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds
  • trunkline installation (about 32.7 kilometres long within State waters)
  • shore crossing site reinstatement
  • rock supply and dumping/sand supply and backfilling of the trench with sand and/or rock to protect the trunkline
  • pre-commissioning testing
  • commissioning and operation
  • decommissioning.
Assessment Number
2194
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Date published
3. Assessment
Environmental Review
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1664
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 1172 - Increase the authorised extent of nominal diameter of the trunkline from 32 inch to 36 inch. No amendments to implementation conditions. Changes approved under s45C on 14 June 2022.

Date of approval s. 45C