Northern Goldfields Interconnect Pipeline

Project
Proposal description

APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region.

The proposal includes associated aboveground infrastructure, such as a compressor station at Ambania and other stations such valve stations, scraper stations etc, at various locations along the pipeline.

The proposal is linear in nature and has an indicative development envelope of 12,404 ha.  Construction of the pipeline will include clearing of up to 2,286 ha, of which 1,934 ha will be native vegetation. The pipeline alignment will make use of existing infrastructure corridors where possible. The pipeline will intersect PEC/TEC Eucalypt Woodlands of the Western Australian Wheatbelt.

Assessment Number
2284
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
3. Assessment
Request for further information
Date
Environmental Review
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1713
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 1184 – Increase in the development envelope of 15 ha to provide an area for the Pinnacles Temporary Work Area construction, consisting of construction accommodation, laydown areas and associated infrastructure. Change to proposal approved under s45C 14 June 2022

Date of approval s. 45C
Get notified of updates and new content