Eramurra Solar Salt Project

Project
Proposal description

Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia.

The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure.

Export of product would be via a previously approved trestle jetty at Cape Preston East Port. However, the proposal includes dredging at Cape Preston East Port with offshore and onshore dredge material disposal options.

Disturbance would be up to 14,300 ha within the terrestrial ponds development envelope, 90 ha within the marine development envelope, and 320 ha within the dredge spoil disposal development envelope.

Assessment Number
2306
Region
Referred under EP Act
s38
Industry sector
Last updated
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
Date Published (Environmental Review documentation)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email