Project Proponent Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd Proposal description The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Assessment Number 1655 Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Last updated August 05, 2011 Current Status Ministerial Statement published 1. Referral Referral documentation ANS0633 DBNGP St 5 Looping ARI FinaL _Revised_.pdf (PDF, 31.5 MB) Appendix 3 Wetlands of Loops 9 and 10.pdf (PDF, 311.96 KB) Appendix 4 Typical drawings.pdf (PDF, 1.04 MB) Mattiske 2003a Veg and Flora report.pdf (PDF, 2.92 MB) Mattiske 2003b Veg and Flora report.pdf (PDF, 5.21 MB) Figure 2 Rare and Priority Flora.pdf (PDF, 41.38 MB) Figure 3 Vegetation.pdf (PDF, 5.03 MB) Figure 4 Condition.pdf (PDF, 4.9 MB) 2. Decision on whether to assess this proposal Chair's Determination Assessment on referral information (ARI) Extract of determination 1655-ChairDets-021006.pdf (PDF, 46.4 KB) Preliminary Environmental Factors Social Surroundings Flora and Vegetation Terrestrial Fauna Hydrological Processes Inland Waters Environmental Quality Date published Monday, October 2, 2006 - 12:00 4. EPA Report on assessment EPA Report Number 1231 EPA Report Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion (PDF, 890.88 KB) Key Environmental Factors Flora and Vegetation Terrestrial Environmental Quality Water Inland Waters Environmental Quality Date published Wednesday, October 4, 2006 - 12:00 Appeals close Wednesday, October 18, 2006 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Wednesday, December 13, 2006 - 12:00 Ministerial Statement Ministerial Statement 735 (PDF, 1.08 MB) Post-assessment changes s. 45C amendments Attachment 1 to Statement 735- To allow for construction within additional easements granted for the purposes of the Dampier to Bunbury Natural Gas Pipeline - change to proposal approved under s45C on 5 August 2011. Date of approval s. 45C Friday, August 5, 2011 - 12:00