Kwinana Gas-Fired Power Station (Water Cooled Condenser)

Project
Proposal description

The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement.

Assessment Number
1583
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
4. EPA Report on assessment
EPA Report Number
1190
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment to Statement 698 - Amendment of Schedule 1 – Key Proposal Characteristics Table 1 - change to proposal approved on 15 August 2007.

Attachment 2 to Statement 698

  • Include an additional mode of operation
  • Increase the authorised limit of oxides of nitrogen (NOx)
  • Update location maps (Figures 1 and 2)

Changes approved under S45c on 3 November 2020.

Attachment 3 to Statement 698 - Increase in power generation capacity and thermal efficiency. Changes approved under S45c on 22 April 2024.

Date of approval s. 45C