Service vessel facility, Princess Royal Harbour, Albany

Project
Proposal description

The proposal is to improve Albany Port's facility for the mooring of existing port service vessels and for a new large tug. The proposal involves:

  • dredging of approximately 25,000 cubic metres (m3) (1.6 hectares) of material to provide a maximum water depth of -6m CD (Chart Datum);
  • reclamation of 0.4 hectares of PRH using dredge spoil;
  • establishment of a coarse sand beach fronting the reclamation area;
  • construction of a rubble mound breakwater, approximately 250 metres long, using locally available quarry materials; and
  • the construction of three steel piled jetties to provide permanent mooring for two tugs, a pilot boat and line boat.
Assessment Number
1028
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
4. EPA Report on assessment
EPA Report Number
820
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email