Albany Port Expansion Project (s. 46)

Project
Proposal description

The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7).

Inquiry under s46 relating to Ministerial Statement 846 and EPA Report 1346 to extend the time limit.

Assessment Number
2039
Referred under EP Act
s46
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Extract of determination
Date published
4. EPA Report on assessment
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Amendment of condition 3 of Ministerial Statement 0846 – Albany Port Expansion Project.

Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email