Attachment 1 to Statement 795 - Discrete drilling and low level blasting of hard rock outcrops in a small portion of the onshore pipeline trench at various locations - change to proposal approved under s45C on 7 April 2010.
Attachment 2 to Statement 795 - increase the gas plants daily maximum production capacity via efficiencies created within the facilities existing infrastructure, extent and environmental footprint. - change to proposal approved under s45C on 1 September 2021.
Date of approval s. 45C


Attachment 1 - Discrete drilling and low level blasting of hard rock outcrops in a small portion of the onshore pipeline trench at various locations - change to proposal approved under s45C on 7 April 2010.