Devil Creek Gas Development Project

Project
Proposal description

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing.

Assessment Number
1710
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1307
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Attachment 1 - Discrete drilling and low level blasting of hard rock outcrops in a small portion of the onshore pipeline trench at various locations - change to proposal approved under s45C on 7 April 2010.

Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 795 - Discrete drilling and low level blasting of hard rock outcrops in a small portion of the onshore pipeline trench at various locations - change to proposal approved under s45C on 7 April 2010.

Attachment 2 to Statement 795 - increase the gas plants daily maximum production capacity via efficiencies created within the facilities existing infrastructure, extent and environmental footprint. - change to proposal approved under s45C on 1 September 2021.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email