Duplication of iron ore mining operation, Yandi mine ML 270SA, Hamersley Range

Project
Proposal description

The proposal is to develop a second open-cut iron ore mining operation on Mineral Lease 270SA. Known as the Central Mesa 1 and 2 operation, the new proposed mine site is located in the Hamersley Ranges of the Pilbara Region of Western Australia. The proponent proposes that a lease-wide Environmental Management Programme be developed and apply to both the Central Mesa 1 and 2 mine, the Yandi E2 mine and future operations on Mineral Lease 270SA.

The proposed second iron ore mining operation, Yandi C1/C2, is located on resources totalling approximately 200 Mt. Lowering of the present water table by approximately 40 m is necessary to recover all of the economic ore. The operation will be serviced by an additional rail spur of approximately 10 km length, terminating in a loop. The crushing, screening and trainloading facilities will essentially be a duplication of the infrastructure already in place to serve the existing Yandi E2 operations.

Assessment Number
960
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
4. EPA Report on assessment
EPA Report Number
802
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment to Statement 405 - extension of time limit for submission of decommissioning plan to 31 December 1998 - change to proposal approved on 6 February 1998.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email