East Hamersley Railway Project

Project
Proposal description

The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting infrastructure.  

The proposal has a development envelope of 31,507 hectare (ha) and a disturbance footprint of 4,837 ha.  

The proposed railway connects the proposed Nyidinghu Iron Ore Mine to the existing Fortescue railway line 14 km north-west of the Cloudbreak mine, crossing Weeli Wolli Creek and the Fortescue Marsh.  

The proposal includes transport, electricity, and water pipeline infrastructure between the Nyidinghu Iron Ore Mine proposal to connect to existing operations.  

The Nyidinghu Iron Ore Mine has also been referred to the Environmental Protection Authority and is being considered concurrently to this proposal. Further information on the Nyidinghu Iron Ore Mine is available here

Assessment Number
2375
Region
Referred under EP Act
s38
Industry sector
Last updated
1. Referral
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Environmental scoping document
Approved
Change to proposal during assessment under s. 43A
Date of approval s. 43A
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email