Koolyanobbing Iron Ore Expansion

Project
Proposal description

Portman Iron Ore Limited proposes to expand the existing Koolyanobbing iron ore mine by commencing new mining at Windarling Range and Mt Jackson and linking the new minesites to Koolyanobbing by a haul road or railway.

Assessment Number
1374
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Preliminary Environmental Factors
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
1082
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Also refer to Ministerial Statement 874 for amendments to conditions.

Date of approval
Post-assessment changes
S46C changes to conditions

Attachment 3 to Statement 627 – Correction of error in calculation of mine pit area for Windarling – change to proposal approved under s46C on 4 August 2008.

Date S46C
s. 45C amendments

Attachment 1 to Statement 627 – In schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 5 May 2005.

Attachment 2 to Statement 627 – Increase in area of native vegetation clearing at the Windarling W3/5 pit area by 52.9 hectares to develop a new waste dump (47.9 hectares with maximum height of 540m AHD) and extend the area for stock piling (5 hectares) – change to proposal approved under s45C on 11 March 2008.

Attachment 4 to Statement 627 – An increase in ore production of 10/% – change to proposal approved under s45C on 7 October 2008.

Attachment 5 to Statement 627 – Increase ore production at the ore handling plant at Koolyanobbing from 8.8 million tonnes per annum up to 11.5 million tonnes per annum – change to proposal approved under s45C on 20 August 2010.

Attachment 6 to Statement 627 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011.

Attachment 7 to Statement 627 – Reduction of project impacts to Declared Rare Flora – change to proposal approved under section 45C on 25 September 2012.

Attachment 8 to Statement 627 – Increase in disturbance footprint of 45 ha at Windarling to allow for stockpiling of topsoil, subsoil and vegetation materials to be used in future rehabilitation – change to proposal approved under section 45C on 12 October 2012.

Attachment 9 to Statement 627 – Mining of Windarling Range W1 deposit below the groundwater table – change to proposal approved under section 45C on 20 November 2012.

Attachment 10 to Statement 627 – Increase to Windarling W4 West waste rock dump area and ore stockpile area – change to proposal approved under section 45C on 20 November 2013.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email