Project Proponent TiO2 Corporation Ltd Proposal description In November 1987 the TiO2 Corporation submitted to the Environmental Protection Authority an ERMP describing a proposal which included the establishment of a mineral sands dry separation plant at a site just north of Muchea on the Brand Highway. The EPA assessed that proposal subject to the implementation of several commitments and recommendations (EPA Bulletin 330, March 1988) and found it environmentally acceptable. Subsequently the proponent submitted a proposal for the establishment of a synthetic rutile plant on the same site and was advised that the site was too close to Muchea for the synthetic rutile plant to be environmentally acceptable. This was due to potential impact from air emissions such as hydrogen sulphide. The proponent required both plants to be on the same location to enable ilmenite produced by the dry process plant to feed directly into the synthetic rutile plant, and wastes from the synthetic rutile plant to be backloaded to the minesite in trucks delivering concentrate to the dry process plant. Also a joint location offered economies in shared administration facilities and services. Consequently the proponent located a potential alternative site and submitted separate proposals for a dry process plant and a synthetic rutile plant on that site. This assessment is of the dry process plant (Assessment 191A). The assessment of the synthetic rutile plant (Assessment 191B) is reported in EPA Bulletin 377 (Ministerial Statement 67). Assessment Number 191A Region Perth Referred under EP Act s38 Industry sector Mineral sands Last updated May 03, 1989 Current Status Ministerial Statement published 1. Referral Referral documentation Notice of Intent (PDF, 5.38 MB) 2. Decision on whether to assess this proposal Chair's Determination Assess - Public Environmental Review Date published Sunday, July 10, 1988 - 12:00 4. EPA Report on assessment EPA Report Number 344 EPA Report Mineral Sands Dry Processing Plant, Muchea (PDF, 740.58 KB) Date published Wednesday, August 31, 1988 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Comments Attachment 1 to Statement 50 - amends Condition 7 so that the first three words of that Condition, which previously read "Prior to construction" now read "Prior to commissioning" - change to conditions approved on 3 May 1989. Date of approval Monday, December 12, 1988 - 12:00 Ministerial Statement Ministerial Statement 50 (PDF, 206.79 KB)