Murrin Murrin nickel cobalt project (s46) [1051]

Project
Proposal description

The Murrin Murrin nickel cobalt project was originally assessed at the level of a Consultative Environmental Review, with the EPA providing its report and recommendations to the Minister for the Environment in May 1996. Approval to implement the project, subject to a number of Environmental Conditions, was issued on 5 June 1996.

In August 1996 Anaconda Nickel referred proposals to the EPA to modify components to the project, and to locate certain project facilities at alternate sites. The Minister for the Environment requested the EPA to assess the proposed modifications under Section 46 of the Environmental Protection Act 1986, which provides the mechanism for changing Environmental Conditions applicable to a project. In addition the EPA decided to assess the proposed site alternatives at the level of a Consultative Environmental Review. A combined CER/S46 report was released in September 1996.

This is the s46 inquiry into amending the conditions of Ministerial Statement 418.

Assessment Number
1051
Referred under EP Act
s46
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Date published
4. EPA Report on assessment
EPA Report Number
835
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email