Pinjarra Cogeneration Project

Project
Proposal description

The proposal is for construction of a natural gas fired cogeneration facility on a 2.5ha site located within Alcoa’s Pinjarra Alumina Refinery. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will own the facility and will supply steam to Alcoa for refinery purposes. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will sell the power generated to customers within the South-West Interconnected System (SWIS). Alcoa will operate the facility within the framework of the Pinjarra refinery operations.

The cogeneration facility will be built in two stages, each comprising a self-contained unit. It is envisaged that each unit will be capable of generating up to 160 megawatts of electricity and up to 222 tonnes per hour of high pressure steam. All of the electrical power generated will be sold to customers connected to the South-West Interconnected System (SWIS). Waste heat from the gas turbines will be used to generate steam that will be used within the refinery.

Assessment Number
1462
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
4. EPA Report on assessment
EPA Report Number
1081
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email