Pluto LNG Development (Site B Option), Burrup Peninsula

Project
Proposal description

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility.

Assessment Number
1632
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1259
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Originally Statement 747, published on 3 September 2007, superseded by this Statement (757) on 24 December 2007.

Date of approval
Post-assessment changes
S46C changes to conditions

Attachment 4 - Change to Schedule 6 (Summary of Proponent Offsets) – change to conditions approved under section 46C on 24 January 2011.

Date S46C
s. 45C amendments

Attachment 1 - increment of Pluto LNG development project disturbance footprint to allow for minor infrastructure reconfiguration and realignment, and for the addition of security fencing required due to the facility being classified as a site of Vital National Importance - s45C change to proposal approved on 6 May 2008.

Attachment 2 - to include the construction of an Emergency Escape Route (walkpath) from Site B to Haul Road in the currently approved disturbance footprint of the proposal (as shown on Figure 5) - s45C change to proposal approved on 20 August 2009.

Attachment 3 - To increase the land disturbance footprint of the proposal by 3.03 hectares - change to proposal approved under s45C on 29 March 2010.

Attachment 5 - Changes:

  • Deletion of the described gas field from the Proposal preamble, to clarify that gas from other fields can be processed at Pluto LNG (as per the Public Environmental Review);
  • Deletion of the described gas turbine types used to drive the liquefaction compressors and for power generation from Schedule 1, to allow for greater flexibility in turbine design;
  • Inclusion of gas export via shipping, trucking or piping to Schedule 1, to reflect the existence of the Pluto LNG trucking facility and proposed Pluto-North West Shelf Interconnector.
  • Deletion of the described gas field Pluto North West Shelf from the Proposal Schedule 1 to gas fields.

 Changes to proposal approved under section 45C on 1 July 2019.

Date of approval s. 45C