Shark Bay Salt, pond expansion, Useless Inlet

Project
Proposal description

The proposal is to increase production capacity by constructing a levee across Useless Inlet near the northern limit of the mining lease which is about 7 km from Clough's Bar.

The levee would be constructed of earthen materials taken from two quarries on either side of Useless Inlet and would have an engineering design similar to that of other breakwaters, such as at Hillary's Marina, with a relatively impermeable core of sandy material and an outer covering of rock.

There would be two tidal flap-gates that allow seawater to enter on flood tides but prevent its escape on ebb tides.

Assessment Number
183
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
542
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email