Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana

Project
Proposal description

Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa;  and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. 

The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective management of waste gas.  

The Sodium Cyanide Facility is located within the CSBP Kwinana Industrial Complex in the Kwinana Industrial Area, approximately 40 kilometres south of Perth. 

Assessment Number
2288
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
4. EPA Report on assessment
EPA Report Number
1725
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Ministerial Statement 1196 - Amendment to the introduction, figures, schedule 1 and condition 1-1. Changes aproved under s. 45C on 27 August 2024.

Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email