Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel

Project
Proposal description

APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o) slopes and the restored landform will be suitable for potential future residential use.

Assessment Number
1301
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Preliminary Environmental Factors
Date published
3. Assessment
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
1194
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Ministerial Statement 767 - Remove the northern portion of Lot 2 Calinup Road from the proposal. Amend the development envelope in the southern portion of Lot 2 Calinup Road
to correctly align with cadastre. Change to conditions approved under S45c on 31 January 2022.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email