Turkey Point Access Road and Bridge

Project
Proposal description

The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia.  

The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha.

Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as potential foraging habitat for Black Cockatoos and 0.03 ha identified as potential Black Cockatoo breeding habitat. 

Two (2) registered Aboriginal heritage sites are known to occur within the Proposal DE. Acid sulphate soil (ASS) risk mapping over the Proposal DE indicating the Proposal is within an area that has a high to moderate risk of ASS.

Assessment Number
2275
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1719
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 1192 - Amendments to introduction, condition 1, figure and schedule 1. Change to statement approved under s. 45C on 5 September 2024.

Attachment 2 to Statement 1192 – Amendments to condition 1 (figure and schedule 1), condition 3-4 and the addition of a definition for Temporary construction causeway.  Changes to statement approved under s. 45C on 17 March 2025

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email