Utah Point Berth Project (Stage B)
Project
Proposal description
The Utah Point Berth Project consists of two separate stages:
Stage A: Dredging and Reclamation; and
Stage B: Construction and Operation.
Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed.
The EPA determined that Stage B, the construction and ongoing operation of stockyard and ship-loading facilities required formal environmental impact assessment. This assessment report relates only to Stage B.
Referred under EP Act
s38
Last updated
September 27, 2024
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
Monday, December 11, 2006 - 12:00
3. Assessment
Scoping
Approved
Friday, July 27, 2007 - 12:00
Environmental Review
Environmental Review documentation
Proponent response to submissions
4. EPA Report on assessment
Key Environmental Factors
Date published
Monday, January 12, 2009 - 12:00
Appeals close
Tuesday, January 27, 2009 - 12:00
5. Decision on proposal and implementation of proposal
Withdrawal of Ministerial Statement
Notice of withdrawal of Ministerial Statement
Date withdrawn
Friday, September 27, 2024 - 12:00
Ministerial Statement
Date of approval
Wednesday, March 4, 2009 - 12:00
Post-assessment changes
s. 45C amendments
Attachment 1 to Statement 788 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.
Date of approval s. 45C
Monday, December 14, 2015 - 12:00
Attachment 1 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.