Wallaby Gold Mine Project

Project
Proposal description

Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings storage facility. Dewatering with some discharge to Lake Carey will occur.

Assessment Number
1348
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
3. Assessment
4. EPA Report on assessment
EPA Report Number
981
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 551 - Change to Schedule 1 approved under s. 45C on 23 June 2006.

Attachment 2 to Statement 551 - Increased proposal life from 2015 to 2051 to allow reactivation of Wallaby Waste Rock Landform to receive waste from Wallaby Underground. Inclusion of a development envelope and contemporary updates to some proposal elements. Change approved under s. 45C on 2 December 2025.

Date of approval s. 45C
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email