Project Proponent Strike South West Pty Ltd Proposal description Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline. The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan). The proposal would include a total disturbance area of 15.31 hectares (ha) within a development envelope of 91.41 ha. No clearing of native vegetation is required. The maximum life of the project is 10 year Region Wheatbelt Referred under EP Act s38 Industry sector Oil and gas Last updated July 11, 2022 Current Status Decision on whether to assess has been published 1. Referral Comment on this referral The Walyering Conventional Gas Development Referral documentation Referral Form (PDF, 384.83 KB) Proposal Content Document (PDF, 799.56 KB) s38 Referral Document Rev 2 - The Walyering Conventional Gas Development - Strike South West Pty Ltd.PDF (PDF, 3.36 MB) 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. No advice given (Appealable) Extract of determination The Walyering Conventional Gas Development (PDF, 303.01 KB) Date published Monday, July 11, 2022 - 12:00