West Erregulla Processing Plant and Pipeline

Project
Proposal description

AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia.  

The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). 

The proposal includes a gas processing facility with a nominal production capacity of 87 terajoules per day, a 16.5 km interconnecting buried gas pipeline, a custody transfer metering facility at the DBNGP tie in point, a pig launcher station, evaporation pond, a power generation system, flare system, incinerator, fire water system, accommodation and office facilities, water treatment package, back up diesel generator and communications system.  

The proposal will result in the clearing of up to 90 hectares (ha) of native vegetation within a 213 ha Development Envelope. 

The life of the proposal is for 60 years.

Assessment Number
2305
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Environmental Review
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
4. EPA Report on assessment
EPA Report Number
1749
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email