Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production

Project
Proposal description

Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the Environmental Protection Act, 1986 for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. 

Assessment Number
1526
Region
Referred under EP Act
s38
Industry sector
Last updated
2. Decision on whether to assess this proposal
Date published
3. Assessment
Environmental Review
Environmental Review documentation
Proponent response to submissions
4. EPA Report on assessment
EPA Report Number
1209
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 719 - Change the power plant from a single coal fired boiler to two circulating fluidized bed co-generation boilers - change to proposal approved on 26 October 2007.

Attachment 2 to Statement 719 - Increase the maximum production capacity to 4.7 million tonnes per annum - change to proposal approved on 26 February 2008.

Attachment 3 to Statement 719 - Clear 29 hectares of State forest for a lay down area for expansion-related plant and equipment and further stockpiling of overburden material for construction of bauxite residue disposal areas - change to proposal approved on 17 April 2008.

Attachment 4 to Statement 719 - Clear 16.5 hectares of State forest to expand freshwater lake at the bauxite refinery - change to proposal approved on 25 July 2008.

Attachment 5 to Statement 719 - Install an additional secondary crushing plant adjacent to the existing crushing facilities at Saddleback - change to proposal approved on 23 January 2009.

Attachment 6 to Statement 719 - Change to conveyor operations - change to proposal approved under s45C on 27 June 2011.

Attachment 7 to Statement 719 – Change to Sulphur Dioxide and Carbon Monoxide emissions – change to proposal approved under s45C on 30 April 2012.

Attachment 8 to Statement 719 - Increase in clearing within the Refinery Lease Area from 45.5 to 66.6 ha - change to proposal approved under s45C on 15 April 2016.

Attachment 9 to Statement 719 - Construction of a temporary water supply pipeline and associated pumping infrastructure from Wellington Dam to the Worsley Refinery which requires clearing of up to 2 ha of undisturbed native vegetation and up to 6 ha previously native vegetation within Wellington National Park - change to proposal approved under s45C on 30 November 2016.

Attachment 10 to Statement 719 - Conversion of the existing coal fired boilers to a natural gas fired facility (boilers) within the existing power and steam raising facilities at the Worsley Alumina Refinery. - change to proposal approved under s45C on 16 May 2023.

Date of approval s. 45C