Northern Looping Project, Loops 1 to 9 Karratha to Bullsbrook

Project
Proposal description

The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin.
Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design results in an increase in the gas flow rate and an increase in the volume of gas stored within the pipeline infrastructure.

Assessment Number
1611
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Date published
4. EPA Report on assessment
EPA Report Number
1208
Key Environmental Factors
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment - Change to Schedule 1 - description of proposal - change to proposal approved under s45C on 29 June 2006.

Date of approval s. 45C