Project Proponent Griffin Electricity Pty Ltd Proposal description The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement Process (PPP). Note: The proposal was withdrawn on 17 October 2005 before the Minister's decision on implementation. Assessment Number 1544 Region South West Referred under EP Act s38 Industry sector Power generation Last updated October 17, 2005 Current Status Proposal withdrawn 2. Decision on whether to assess this proposal Chair's Determination Assess - Public Environmental Review Preliminary Environmental Factors Social Surroundings Marine Environmental Quality Hydrological Processes Date published Monday, 22 November, 2004 3. Assessment Scoping Approved Monday, 20 December, 2004 Environmental Review Environmental Review documentation PER document (PDF, 14.17 MB) Proponent response to submissions Proponent's response to submissions (PDF, 462.93 KB) RTS Attachment 1 - Collie Power Station Noise Map (PDF, 53.93 KB) RTS Attachment 2 - Bluewaters Power Station Noise Map (PDF, 61.09 KB) RTS Attachment 3 - Collie and Bluewaters Combined Noise Map (PDF, 70.31 KB) RTS Attachment 4 - Comparison of ENM vs SoundPlan Noise Models (PDF, 72.24 KB) RTS Attachment 5 - Coolangatta Noise Management Plan (PDF, 110.2 KB) RTS Attachment 6 - Health Impact Statement (PDF, 1.76 MB) RTS Attachment 7 - Letter to EPA from Griffin detailing greenhouse offsets (PDF, 109.9 KB) RTS Attachment 8 - Power Station Water Balance (PDF, 77.55 KB) RTS Attachment 9 - Griffin Energy Water Supply Strategy (PDF, 144.43 KB) RTS Attachment 10 - Environmental Management Plan (PDF, 14.39 MB) RTS Attachment 11 - Re-estimation of Hazard Index for Acid Gases (PDF, 106.67 KB) RTS Attachment 12 - Criteria Pollutants Health Effects (PDF, 115.17 KB) RTS Attachment 13 - Map Showing Saline Water Pipeline Location (PDF, 71.79 KB) 4. EPA Report on assessment EPA Report Number 1176 EPA Report Collie B Power Station (PDF, 1.14 MB) Key Environmental Factors Social Surroundings Water Inland Waters Environmental Quality Date published Monday, 13 June, 2005 Appeals close Monday, 27 June, 2005