This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 1, 2021
Kimberley Agricultural Investment (KAI) Pty Ltd proposes to develop 3086 hectares of land for the purposes of perennial and annual cropping, including grains, cotton and horticulture (which may include citrus and/or mango trees or other tree crops). The proposal is located between House Roof Hill and the Ord River, approximately 40 kilometres north-west of Kununurra, in the Shire of Wyndham-East Kimberley. Carlton Plains Stage 1 forms the initial component of the staged development of four... Read more...Last updated: February 1, 2021
Peet Stratton Pty Ltd propose to develop the Lot 102 for urban uses as part of the wider Movida residential development. The proposal area is 8.6 hectares (ha) of which approximately 6ha is proposed for development. 2.65ha of native vegetation is proposed to be retained for conservation purposes. Read more...Last updated: November 19, 2018
Argyle Cattle Company Pty Ltd proposes to disturb up to to 1,200 ha of native vegetation for 650 ha of irrigated pasture and fodder and associated infrastructure. The proposal is located 64 km south of Broome on the Great Northern Highway, in the Shire of Broome. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: February 12, 2014
Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...Last updated: August 9, 2013
Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: March 28, 2007
Greendene Development Corporation Pty Ltd proposes to subdivide an area of land (Locations 9002 and 9101) within the developing Riverslea residential area, one kilometre east of the Margaret River townsite. Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: December 4, 2003
The Conservation Commission of Western Australia has prepared through the agency of the Department of Conservation and Land Management, a Proposed Forest Management Plan to apply to the Swan, South West and Warren Regions of the Department of Conservation and Land Management during 2004-2013. This is the EPA's assessment of the environmental factors relating to the proposed plan and the Authority's advice and recommendations to the Minister for Environment. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the biodiversity. See here for... Read more...Last updated: November 14, 2001
The proposed airport will be located in a site approximately 12 km north-east of Broome townsite. The proposal involves the construction of one main runway, parallel taxiway, turning nodes, apron parking, general aviation parking, maintenance and storage hangers and fuel storage. It also includes domestic and international terminals, land-side and airside commercial activities and a short future parallel runway for light aircraft. Read more...Last updated: November 6, 1996
The proposal is to dredge two channels to connect the Swan River with an internal artificial water body. Construction of the channel will involve: dredging of one 15m wide, 1 m deep channel through the System 6 area and near shore sandbars at the northern end of the wetland; the excavation of a 55m wide channel to -2.5m AHD, through the southern end of the tip site; plus the dredging of a 320m long, 55m wide navigation channel to -2.5m AHD through river shallows to connect with the main deep... Read more...Last updated: October 11, 1994
In September 1993, the Department of Planning and Urban Development, on behalf of the State Planning Commission referred the two major Amendments to the metropolitan Region Scheme (MRS) effecting the South West Corridor to the Environmental Protection Authority for assessment. These Amendments were identified as Amendment No. 938/33 (Stage A), and Amendment No. 937/33 (Stage B). The Environmental Protection Authority set two different levels of assessment on the proposals contained within the... Read more...Last updated: February 21, 1994
This proposal involves the development of a canal estate with some similarities to one previously proposed at the same site, which was assessed by the Environmental Protection Authority in October 1992 and subsequently withdrawn by the proponent. The principal differences between the previous proposal and this proposal are: a reduction of the area proposed to be developed by approximately 30 hectares; and the ceding of approximately 69 hectares of privately owned land by the proponent to the... Read more...Last updated: November 23, 1992
The proposal is to develop a 30 hectare site on Lot 48 and Part Lot 35 Brixton Street, Kenwick, for mixed density housing. The land immediately to the north of this site is subject to a System 6 recommendation and is managed as a conservation reserve by the University of Western Australia, the owner of the land. The land, the subject of this proposal, is ecologically similar to the reserves north and south and forms a link between these areas. Read more...Last updated: September 21, 1992
The proposal is to build a primary school and church complex within System 6 M93, and within the newly announced Beeliar Regional Park. Read more...