This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 29, 2019
Italia Stone Group proposes to develop a hard rock quarry at Lot 800 Pruden Road Whitby, approximately 3.5 kilometres east of Mundijong in the Shire of Serpentine-Jarrahdale. The proposed quarry is on freehold land and is for the extraction of 50,000 to 100,000 tonnes of hard rock per annum for a period of 20 years. The material will be extracted by drill and blast methods and hauled by truck to a processing area for crushing and stockpiling on site. Read more...Last updated: February 5, 2019
The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north... Read more...Last updated: January 11, 2019
City of Karratha are proposing a trial which involves a total of 7,000m 3 of sand renourishment at Dampier Palms Beach using clean coarse sand from the Extraction Area, south of Hampton Oval. Placement of the sand will occur on the beachface, mostly between mean sea level and highest astronomical tide, at two sites either side of a minor rock control at Dampier Palms Beach. The renourishment is proposed to occur in two stages, with: An initial trial renourishment of nominally 3,000m³ based on... Read more...Last updated: December 12, 2018
The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...Last updated: January 24, 2018
The Shire of Denmark proposes to extend the existing quarry and crush limesand within an A Class Parkland and Recreation Reserve vested in the Shire of Denmark. Read more...Last updated: April 10, 2017
The Shire of Serpentine Jarrahdale proposes to extract gravel from a twelve hectare area known as the Scrivener Road Gravel Reserves. The reserves are located at the top of the scarp south of Serpentine and contain nesting habitat for all three protected black cockatoo species. Extraction is proposed in two hectare stages over a period of thirteen years. Read more...Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...Last updated: December 8, 2016
PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...Last updated: December 8, 2016
The Environmental Protection Authority has received a referral for sand mining operations within prospecting licences P 70/1596 and P70/1597. The prospecting licences are proposed to be converted to a mining lease. The proposed sand mining area is located wholly within State Forest 65 (Gnangara pine plantation) which is vested in the Conservation Commission of Western Australia and managed by the Department of Parks and Wildlife. Read more...Last updated: December 8, 2016
The proposal is to expand the existing Baldivis Sand Quarry Stage 1 operation for approximately three years. The proposal is located within Department of Mines and Petroleum (DMP) mining lease M70/1046 and operates under Department of Environment Regulation (DER) Licence L8176/2007/2 and Department of Water Licence (GWL 162863(2)). The proposal is on Department of Parks and Wildlife managed land (State Forest). The area was previously a pine plantation which was then cleared, burned and... Read more...Last updated: December 7, 2016
Hanson Australia Pty Ltd (‘the proponent’) proposes to develop three sand quarries within the Gnangara Pine Plantation on tenements E70/3279 (Smokebush Hill), E70 - 3275 (Tamega Road) and M70- 1306 (Mulga Road) (‘the proposal’). Smokebush Hill is located in Two Rocks, approximately 55 kilometres (km) north of Per th Central Business District (CBD) . Tamega Road is located in Pinjar, approxi mately 47 km north of Perth CBD. Mulga Road is located in Gnangara, approxi mately 20 km north of Perth... Read more...Last updated: November 30, 2016
The Department of Minerals and Petroleum has referred a Programme of Work application. The application, from Holcim (Australia) Pty Ltd, is to undertake an air core drilling exploration programme on M70/1248 and M70/1250. The exploration site is cleared pine plantation to the East of Lake Jandabup. Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: July 4, 2016
Urban Resources Pty Ltd proposes to develop a sand quarry on tenement M70/1262, located in Karnup approximately 48 kilometres (km) south of the Perth Central Business District. The proposal would extract 1.5 million cubic metres over a project life of around five years with a total disturbance footprint of around 42 hectares including the mining area, stockpiles, a haul road and site compound. The proponent has advised that the overall post-mining land use is expected to be consistent with the... Read more...Last updated: May 10, 2016
Doyles Lime Service Pty Ltd proposes to develop a limestone and sand quarry on Lots 1001 and 1002 Preston Beach Road North, Preston Beach. The estimated resource is 1,000,000 tonnes of limestone extracted at 50,000 tonnes per year and 150,000 tonnes of sand, extracted at 10,000 tonnes per year. The proposed limestone pit is 7.5 hectares (ha) and the sand pit is 1.5 ha with a 2.5 ha pit identified for the future. The proposal is expected to have a life of 20 years. Preston Beach Road North is... Read more...Last updated: April 26, 2016
Brikmakers Pty Ltd proposes to extract clay from Lot 7 Toy Rd Bindoon, within the Shire of Chittering. Approximately 15 hectares (ha) of predominately pasture land will be disturbed for the construction of two clay excavation pits, a stockpile area, two dams, and bunds. Upgrading of a causeway across the Brockman River, which traverses west to east along the southern portion of the property, together with a new crossover to Toy Road is also proposed. Read more...Last updated: May 25, 2015
The proposal is to recommence quarrying at Pivot Hill (M80/618(P) & L80/63(P)). It involves the extraction of up to 45,000 tonnes per year of basalt for use as aggregates in civil works. This would require 4.4 hectares (ha) of clearing of native vegetation in addition to the existing 2.45 hectares of previously disturbed land, within a Mining Lease covering 45 ha. Crushing and screening of aggregates would be undertaken at the site. The proponent has proposed a duration of 10 years... Read more...